JIG Consultants
  • Home
  • About Us
  • Services
    • Water Infrastructures
    • Wastewater Infrastructures
    • Construction Management
  • Recent Projects
    • Third and Forest Pipeline Project
    • Rehabilitation of West Garden Grove BPS
    • Plant 137 and Live Oak Road Waterline
    • Beachwood Pump Station Force Main Investigation
    • Plant 40 Booster Pump Station Improvements
    • Project 92 and 93 Sewer Improvement Projects
    • Ardath Area Water Main Replacement
    • Redevelopment of Well No. 22
  • Newsroom
  • TEAM MEMBERS
  • Contact
  • Accessibility

Beachwood Pump Station and Force Main Investigation

City of Burbank  |  2013

The City of Burbank required assistance in evaluating the condition of existing sewer infrastructures and developing capital improvement projects for immediate implementation.
  • Condition Assessment of the Beachwood Force Main:  Within the previous 10 years, the force main has ruptured on three separate occasions resulting in emergency response and clean-up from City operations staff.  The project assessed the condition of the existing force main, investigated causes for failure, developed alternatives, and performed a life cycle cost analysis for rehabilitation or replacement.
  • Condition Assessment of the Beachwood Pump Station:  Sewage from the southerly half of the City that could not be accommodated into the Beachwood Pump Station over-topped a diversion structure and discharged into the City of Los Angeles North Outfall Sewer.  The project performed a condition assessment of the Beachwood Pump Station to determine the cause for its under performance.  The assessment included temporary flow monitoring stations, installation of miscellaneous monitoring instruments, a 2-day site assessment, and a 7-day data collection period.  With the compiled data, the team prepared a hydraulic study and recommended upgrades to the existing pump station equipment. 



Picture
Picture
Picture

Expertise

Water Infrastructures
Wastewater Infrastructures
Staff Augmentation
Construction Management

Company

Project Management Approach
Client Management
About the President

 Certification

US Small Business Administration - Federal 8(a) Certified
​MBE - Minority Business Enterprise

SB-PW - Small Business Certification
SB (Micro) - Small Business /Micro Business Certification
Picture
 © 2020 JIG Consultants - All rights reserved
  • Home
  • About Us
  • Services
    • Water Infrastructures
    • Wastewater Infrastructures
    • Construction Management
  • Recent Projects
    • Third and Forest Pipeline Project
    • Rehabilitation of West Garden Grove BPS
    • Plant 137 and Live Oak Road Waterline
    • Beachwood Pump Station Force Main Investigation
    • Plant 40 Booster Pump Station Improvements
    • Project 92 and 93 Sewer Improvement Projects
    • Ardath Area Water Main Replacement
    • Redevelopment of Well No. 22
  • Newsroom
  • TEAM MEMBERS
  • Contact
  • Accessibility