JIG Consultants
  • Home
  • About Us
  • Services
    • Water Infrastructures
    • Wastewater Infrastructures
    • Construction Management
  • Recent Projects
    • Third and Forest Pipeline Project
    • Rehabilitation of West Garden Grove BPS
    • Plant 137 and Live Oak Road Waterline
    • Beachwood Pump Station Force Main Investigation
    • Plant 40 Booster Pump Station Improvements
    • Project 92 and 93 Sewer Improvement Projects
    • Ardath Area Water Main Replacement
    • Redevelopment of Well No. 22
  • Newsroom
  • TEAM MEMBERS
  • Contact
  • Accessibility

Rehabilitation of West Garden Grove Booster pump station

City of Garden Grove  |  2015

The project began with an investigation of the existing facility.  The preliminary investigations included a four-day condition assessment of the facility, hydraulic testing of three booster pumps and one well pump, well production and efficiency testing, vibration testing of the pump and engine equipment, and efficiency testing of four natural gas engines.  A Preliminary Design Report (PDR) was prepared which recommended redevelopment of the production well, replacement of all four engines, replacement of the three booster pumps, and minor revisions to the building.

Upon approval of the PDR, two separate contract documents were prepared.  The first was for the redevelopment of Well No. 22 which included removal and reconditioning of the well pump, light swabbing of the casing, water quality testing, chlorination, and re-installation of the well pump and engine.


The second contract document was for Rehabilitation of the West Garden Grove Booster Pump Station.  The project included replacement of the four existing natural gas engines and three booster pumps.  Additional design items included replacement of the LPG storage tank and vaporizers, replacement of engine cooling water piping system, new exhaust fans, and new roof openings for removal of the booster pumps. 
Picture
Picture

Expertise

Water Infrastructures
Wastewater Infrastructures
Staff Augmentation
Construction Management

Company

Project Management Approach
Client Management
About the President

 Certification

US Small Business Administration - Federal 8(a) Certified
​MBE - Minority Business Enterprise

SB-PW - Small Business Certification
SB (Micro) - Small Business /Micro Business Certification
Picture
 © 2020 JIG Consultants - All rights reserved
  • Home
  • About Us
  • Services
    • Water Infrastructures
    • Wastewater Infrastructures
    • Construction Management
  • Recent Projects
    • Third and Forest Pipeline Project
    • Rehabilitation of West Garden Grove BPS
    • Plant 137 and Live Oak Road Waterline
    • Beachwood Pump Station Force Main Investigation
    • Plant 40 Booster Pump Station Improvements
    • Project 92 and 93 Sewer Improvement Projects
    • Ardath Area Water Main Replacement
    • Redevelopment of Well No. 22
  • Newsroom
  • TEAM MEMBERS
  • Contact
  • Accessibility